2026-04-24
Latakia Water Resources Directorate – Follow-up on the maintenance and rehabilitation works of Mashqita Dam networks
Desilting and maintenance works continue on the main canals within the Mashqita Dam networks in the Badmiyun area, in addition to the main open canal in the Jandairiya area, as part of the Latakia Water Resources Directorate's plan to improve the efficiency of irrigation networks and ensure the smooth flow of water. In the Badmiyun area – Mashqita Dam, desilting works were carried out on the main canal (MC1) using specialised machinery, with manual work supported in areas inaccessible to machinery, under the supervision and follow-up of specialised engineering staff.
read more >>